Managed Agent Build
Build production-grade agents on AAIOS using reusable orchestration, policy, evaluation and integration patterns.
What this capability solves
Prototype agents often bypass software engineering, identity, testing and operational controls. Managed Build turns approved designs into production services with repeatable engineering standards.
Technology is implemented as an operating capability: architecture, integration, governance, assurance, people, procedures and measurable outcomes are designed together.
Capability model
Modular building blocks allow the scope to start with a focused pilot and expand into an enterprise operating model.
Agent Runtime Engineering
Implement AAIOS-compatible agents, task graphs, state handling and retries.
Model Abstraction
Use governed model routing so agent logic is not hard-wired to one provider.
RAG / Data Integration
Implement retrieval authorization, source metadata, citations and freshness.
Tool Integration
Build validated adapters to approved enterprise APIs and applications.
Policy Enforcement
Integrate action gates, data controls, approval and limits.
CI/CD & Testing
Version prompts/configuration/code, automate tests and manage environment promotion.
How the capability fits together
Final topology, control placement and deployment model are validated during discovery and detailed design.
Controls & governance
- Least-privilege agent/workload identity
- Human approval for high-impact actions
- Approved tool schemas and transaction validation
- Data classification/DLP at model and tool boundaries
- Memory retention and deletion policy
- Comprehensive traces and action provenance
- Evaluation gates before production
- Kill switch, rollback and incident escalation
Priority use cases
- New enterprise agent
- Prototype-to-production conversion
- Multi-agent workflow
- Internal assistant modernization
- API-driven automation
Key deliverables
- Production agent code/config
- AAIOS deployment package
- Integration adapters
- Automated tests
- Release pipeline
- Operations documentation
Integration considerations
- AAIOS
- Enterprise IAM/workload identity
- APIs and SaaS systems
- Data platform and RAG/vector stores
- Workflow/BPM/ITSM
- SIEM/SOAR and observability
- GRC/evidence systems
- Model endpoints/gateways
Phased delivery
Each phase ends with evidence, acceptance criteria and a decision gate before broader scale-out.
